Case Studies
Real projects, real outcomes
Detailed accounts of the sourcing projects I’ve run — with the constraints, the decisions, and the results named plainly. New case studies are added as recent projects reach a point where the outcome is clear.
How they’re written
What each case study covers
Every case study follows the same eight-part structure so you can compare projects directly instead of guessing at what was left out.
- Client type — brand, retailer, or seller category.
- Industry and product — enough detail to place the project without exposing the client.
- Challenge — the specific problem the client walked in with.
- Solution — the sourcing strategy I proposed.
- Process — the actual sequence of factory work, inspections, and decisions.
- Result — measurable outcomes, both positive and negative.
- Related service — which of my services this project used.
- Related location — the manufacturing region where the work happened.
Why so few case studies?
Case studies take time — that’s the point
Every project I take on gets a case study only after the client has received their goods, sold through them, and had at least one reorder cycle. That takes 6–12 months minimum. What I refuse to publish are ‘case studies’ written before the outcome is knowable — which is most of what appears on sourcing agent websites.
If you’d like to see a case study on a project similar to yours before I have one publicly listed, mention that when you get in touch. I can share sanitised details of a matching engagement one-to-one.
Ready when you are
Need help sourcing from China?
A short brief and I’ll respond within one business day, Shenzhen time. No obligation, no upsell — just an honest read on whether I’m the right partner for your project.